Our Building Process

Our experienced team is here to guide you through the process, every step of the way.

When you build your home with Cunic Homes, you can be assured that our flexibility, reliability and our absolute focus on quality will ensure 100% satisfaction from the design and planning stages, through to completion of your project.

If you have been considering building, why not visit our Display Suite located at 209 Elizabeth Street, Hobart; our team can answer your building related questions and show you our three levels of inclusions.

 

Kingston-007-028.jpg

Building Process for Homes

Preliminary Stage

  • Meet and greet with the Cunic Homes team

  • Preliminary works agreement

  • Site inspection

  • Contour survey

  • Geotechnical report (soil and wind)

  • Concept floor plan

  • Estimate

  • Drafted plans

  • Presentation of quote

  • Signing of build contract

  • Deposit

  • Bank valuation

Planning & Approval

  • Plans prepared for council submission (DA)

  • Selections

  • Presentation of 3D virtual walkthrough

  • Structural engineering

  • Energy assessment

  • Final plans + selections signed off

  • Second stage of council submission (BA)

  • Building surveyor

  • Council approval

Construction Stage

  • Introduction to project manager

  • Cunic Homes App

  • Construction phase

  • Occupancy certificate

  • Council certification

  • Final bank valuation and payment

  • Handover

 

Kingston-007-043.jpg

Building Process for Units

Preliminary Stage

  • Meet and greet with Cunic Homes team

  • One hour consultation to discuss project and Cunic Homes process

  • Preliminary works agreement - stage 1

  • Site inspection

  • Site survey (contours, services and boundaries)

  • Geotechnical report (soil and wind)

  • Bushfire attack level report (B AL)

  • Civil engineering preliminary assessment

  • Design brief for the designer (done with a Cunic Homes team member )

  • DA plans

  • Preliminary works agreement - s tage 2

  • Civil engineering

  • Planning report (if required)

  • DA submission t o council

  • Traffic impact assessmen t (if required)

  • Preliminary works agreement - stage 3

  • Structural engineering

  • BA plans

  • NBN design

  • Taswater certificate of certifiable work (CCW)

  • Tasnetworks design

  • External selections

  • Energy assessment

  • Building surveyor and plumbing submission t o council

  • BA submission t o council

  • Presentation of quote

  • Signing of build contract

Pre-Construction Stage

  • Bank valuation

  • Deposit

  • Unconditional finance approval

  • Selections

  • Presentation of 3D walkthrough

Construction Stage

  • Introduction to project manager

  • Cunic Homes App

  • Construction phase

  • Taswater compliance

  • Occupancy and final certificate

  • Council certification (plumbing and buil ding)

  • Strata fees to be paid

  • Strata title

  • Final bank valuation and payment

  • Handover